日本在线国产视频._在线高清免费爱做网_婷婷五月丁香加勒比在线_中文A∨字幕网站_亚洲码欧洲码精品_黑人和黑人一级毛片_一本综合狼友精彩视频_激情欧美成人免费观看_欧美激情做真爱牲交视频_中文字幕日韩熟女

NEWS CENTER

Learn the latest information

NEWS

Yimai Information

MORE >>

Company profile

Entering Yimai and Creating the Future

Shanghai Yimai Industrial Co.ltd

Innovation, hard work, excellence, focus on improving professional services

Provide customers with green solutions for the whole life cycle and create a better living ecological environment

Shanghai Yimai Industrial Co., Ltd. is a high-tech enterprise integrating R&D, production, sales and service. The company's main products: manufacturing of special machinery and equipment for water resources, intelligent water affairs integrated series products, complete sets of water supply integrated series products, sewage series products, kitchen (organic) waste treatment series products, direct drinking water, integrated water plants, motors and pumps, etc. The production base is located in Shanghai Jinshan Industrial and Economic Development Zone.

MORE

ENGINEERING CASE

Achieving win-win and development

Project Name: Shuiyunhe Courtyard in Xinghua City (Beishan Resettlement House)

Project Overview: The Shuiyun Heyuan project is located in Xinghua City, Jiangsu Province, with a total construction area of 52351.4m2, including a total above ground construction area of 104693.3m2 and an underground construction area of 32374.2m2 (including a civil defense engineering area of 6674m2)

System design: The number of pressurized households is 610, with 3-9F as pressurized zone 1 and 10-15F as pressurized zone 2. Two sets of tank type stacked water supply equipment, YMWXG64.8-41-3 and YMWXG27-56-3, are used for pressurized water supply

Design key points: wet dry separation, equipment layout, visiting passages, decoration, high-end hardware

The pump room construction standard is based on the "Yimai Standard Smart Pump Room Construction Standard".

Project Name: Shuiyunhe Courtyard in Xinghua City (Beishan Resettlement House)

Project Overview: The Shuiyun Heyuan project is located in Xinghua City, Jiangsu Province, with a total construction area of 52351.4m2, including a total above ground construction area of 104693.3m2 and an underground construction area of 32374.2m2 (including a civil defense engineering area of 6674m2)

System design: The number of pressurized households is 610, with 3-9F as pressurized zone 1 and 10-15F as pressurized zone 2. Two sets of tank type stacked water supply equipment, YMWXG64.8-41-3 and YMWXG27-56-3, are used for pressurized water supply

Design key points: wet dry separation, equipment layout, visiting passages, decoration, high-end hardware

The pump room construction standard is based on the "Yimai Standard Smart Pump Room Construction Standard".

Project Name: Jiantou and Runjia Garden in Lingbi County

Project Overview: The He Run Jia Yuan project is a key resettlement housing project in Lingbi County, covering an area of approximately 38.3 acres with a building area of 75533 square meters. It mainly includes 6 high-rise residential buildings, commercial and underground parking lots, and supporting facilities such as surrounding green landscapes, and can accommodate a total of 486 households of surrounding residents

System design: 1-11F is the first pressurized zone, and 12-18F is the second pressurized zone; 19-23F is the third zone of pressurization. Three sets of tank type stacked water supply equipment, YMWG37-42-3, YMWG20-64-3, and YMWG15-83-3, are used for pressurized water supply

Design key points: wet dry separation, equipment layout, visiting passages, and decoration

The pump room construction standard is based on the "Yimai Standard Smart Pump Room Construction Standard".

Project Name: Jiantou and Runjia Garden in Lingbi County

Project Overview: The He Run Jia Yuan project is a key resettlement housing project in Lingbi County, covering an area of approximately 38.3 acres with a building area of 75533 square meters. It mainly includes 6 high-rise residential buildings, commercial and underground parking lots, and supporting facilities such as surrounding green landscapes, and can accommodate a total of 486 households of surrounding residents

System design: 1-11F is the first pressurized zone, and 12-18F is the second pressurized zone; 19-23F is the third zone of pressurization. Three sets of tank type stacked water supply equipment, YMWG37-42-3, YMWG20-64-3, and YMWG15-83-3, are used for pressurized water supply

Design key points: wet dry separation, equipment layout, visiting passages, and decoration

The pump room construction standard is based on the "Yimai Standard Smart Pump Room Construction Standard".

Partners

Achieve win-win and development